General development plan for potential oil and gas discoveries in Cuu Long basin
Abstract
Cuu Long is the basin which has the longest history of offshore petroleum exploration and production in Vietnam to date. Alongside developed fields, there are many oil and gas discoveries in the basin which have not been developed. Thus, there is an urgent need to establish an appropriate general development plan for these discoveries. The authors carried out hydrocarbon initial in-place and reserve assessment and examined different development options for these undeveloped oil and gas potentials. The study shows that many undeveloped oil and gas discoveries can tie in to the existing production facilities in Cuu Long basin to maximise the use of these existing infrastructures. Other fields can be developed in stand-alone concept. The authors also made specific recommendations on development schedule for these discoveries, the priority to explore potential prospect and on adjustment of terms and conditions of petroleum sharing contract for small and marginal oil and gas fields.
References
Bộ Công nghiệp (Bộ Công Thương). Quyết định số 38/2005/QĐ-BCN về Quy định phân cấp tài nguyên, trữ lượng dầu khí và lập báo cáo trữ lượng dầu khí. 6/12/2005.
Tổng công ty Dầu khí Việt Nam. Địa chất và Tài nguyên Dầu khí Việt Nam. Nhà xuất bản Khoa học và Kỹ thuật. 2005.
Tổng công ty Thăm dò Khai thác Dầu khí. Báo cáo trữ lượng và cập nhật trữ lượng đã phê duyệt đến 30/6/2013 các mỏ thuộc bồn trũng Cửu Long.
Tổng công ty Thăm dò Khai thác Dầu khí. Báo cáo đầu tư các Lô 15-2 mở, 16-1 mở, 15-1/05; 16-2; 09-2/10; 01/10 & 02/10.
Viện Dầu khí Việt Nam. Báo cáo kết quả nghiên cứu Đề tài “Đánh giá tiềm năng dầu khí trên vùng biển và thềm lục địa Việt Nam” (thuộc Đề án tổng thể “Điều tra cơ bản và quản lý tài nguyên, môi trường biển đến năm 2010, tầm nhìn đến năm 2020”). 2013.
Tổng công ty Tư vấn Thiết kế Dầu khí - CTCP. Nghiên cứu khả năng kết nối, cải hoán điểm tiếp nhận các mỏ bể Cửu Long. 12/2013.
Kinh Ngu Trang field development feasibility study for production tie-in to Block 15-2 facility. 14 August, 2012.
Thang Long - Dong Do field development plan (final submission).25 August, 2011.
Nam Rong - Doi Moi full field development plan. 2013.
Full field development & production plan Block 15-1, Su Tu Den/Su Tu Vang complex 2012 update.
Revised full field development plan of Rang Dong field. March 2012.
Block 16-1, offshore Viet Nam, Te Giac Trang field development plan (revision 2). 15 November, 2010.
1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.